Why old RFIs are some of your firm's most valuable knowledge

Short answer

Old RFIs record exactly where the drawings didn't match reality and what the team decided instead. When new work starts at the same location, those answers prevent repeat mistakes. They are valuable because they are specific to a place, which is also why they are hard to find later by keyword.

By the KAMEO team · Updated

What is an RFI?

A request for information (RFI) is a formal question, usually from the contractor to the design team, asking to clarify the drawings, specifications or other contract documents. The response may confirm the design, clarify it or change it, sometimes alongside a change order.

Why do old RFIs matter?

An RFI is the record of a gap between the documents and the real conditions on site: an unexpected utility, a product that wasn't available, a dimension that didn't work. The answer captures what the team actually did. Years later, when the same area is redesigned or rehabilitated, that is exactly what the new designer needs to know, and it usually isn't on the original drawings.

  • They reveal site conditions the drawings missed.
  • They record substitutions and changes to specified products.
  • They show which details caused trouble in construction.

Why are they hard to find later?

RFIs are filed inside each project's folder, often as numbered PDFs or in a contractor's platform export, and closed out with the project. A later designer would need to know which earlier projects touched the area, open each folder, and read through dozens of RFIs to find the relevant one.

How to make RFIs findable

Start by tying projects to places, so the RFIs of every project at a location are one click away. KAMEO Space does this today with its site map. Searching inside RFIs, specifications and reports, with AI answers that cite the specific RFI, is part of the next KAMEO Space release.

Frequently asked questions

What is the difference between an RFI and a submittal?

An RFI asks the design team a question about the documents. A submittal is something the contractor sends for review, such as shop drawings or product data, to show it meets the specification.

Should RFIs be kept after a project closes?

Yes. Beyond any contractual retention requirements, closed-out RFIs are a record of real site conditions and decisions that is valuable for future work at the same location.